Custom Equipment Ordering Process

Trusted by 30+ Countries Worldwide

Consultation and docking

After the customer submits the requirements, the salesperson communicates one-on-one to clarify the application scenarios, equipment models, and customization requirements (size/power, etc.).

Requirement Validate

The technical team intervenes, providing scheme drawings/parameter lists, and enters the quotation stage after customer confirmation.

Quotation signing

Provide price details within 3 hours, sign the contract and collect a deposit, and lock in the production schedule.

Flexible Production

Material procurement → Stainless steel processing → Assembly → Oil fume purification equipment → Whole machine joint debugging (7-15 days).

Factory quality inspection

72 hour load test+air volume/purification rate detection, providing detection reports simultaneously.

Logistics delivery

Transportation, full tracking of arrival.

After sales closed loop

2-year core component warranty, 24-hour fault response.